This page is part of the Da Vinci Data Exchange for Quality Measures (DEQM) FHIR IG (v4.0.0: STU4 (v4.0.0)) based on FHIR R4. This is the current published version. For a full list of available versions, see the Directory of published versions
Official URL: http://hl7.org/fhir/us/davinci-deqm/StructureDefinition/extension-calculatedDate | Version: 4.0.0 | |||
Active as of 2018-06-19 | Computable Name: DEQMCalculatedDateExtension |
This extension applies to the date the metric was actually calculated. If your measure calculation draws on stored calculations and there are multiple calculation dates, this extension would not apply, as in the example of a composite measure where the individual measures were calculated on different dates. This would only cover the case where there is only one calculation date.
Context of Use
This extension may be used on the following element(s):
Usage info
Usage:
Description of Profiles, Differentials, Snapshots, and how the XML and JSON presentations work.
This structure is derived from Extension
Summary
Simple Extension of type dateTime: This extension applies to the date the metric was actually calculated. If your measure calculation draws on stored calculations and there are multiple calculation dates, this extension would not apply, as in the example of a composite measure where the individual measures were calculated on different dates. This would only cover the case where there is only one calculation date.
This structure is derived from Extension
Name | Flags | Card. | Type | Description & Constraints |
---|---|---|---|---|
Extension | 0..1 | Extension | The date the score was calculated | |
id | 0..1 | string | Unique id for inter-element referencing | |
extension | 0..* | Extension | Additional content defined by implementations Slice: Unordered, Open by value:url | |
url | 1..1 | uri | "http://hl7.org/fhir/us/davinci-deqm/StructureDefinition/extension-calculatedDate" | |
value[x] | 0..1 | dateTime | The date the score was calculated. | |
Documentation for this format |
This structure is derived from Extension
Summary
Simple Extension of type dateTime: This extension applies to the date the metric was actually calculated. If your measure calculation draws on stored calculations and there are multiple calculation dates, this extension would not apply, as in the example of a composite measure where the individual measures were calculated on different dates. This would only cover the case where there is only one calculation date.
Differential View
This structure is derived from Extension
Snapshot View
Name | Flags | Card. | Type | Description & Constraints |
---|---|---|---|---|
Extension | 0..1 | Extension | The date the score was calculated | |
id | 0..1 | string | Unique id for inter-element referencing | |
extension | 0..* | Extension | Additional content defined by implementations Slice: Unordered, Open by value:url | |
url | 1..1 | uri | "http://hl7.org/fhir/us/davinci-deqm/StructureDefinition/extension-calculatedDate" | |
value[x] | 0..1 | dateTime | The date the score was calculated. | |
Documentation for this format |
Other representations of profile: CSV, Excel, Schematron