R4 Draft for Comment

This page is part of the FHIR Specification (v3.2.0: R4 Ballot 1). The current version which supercedes this version is 5.0.0. For a full list of available versions, see the Directory of published versions . Page versions: R4 R3

V2-0472.vs.xml

Vocabulary Work GroupMaturity Level: N/ABallot Status: Informative

Raw XML (canonical form)

FHIR Value set/code system definition for HL7 v2 table 0472 ( TQ Conjunction ID)

<ValueSet xmlns="http://hl7.org/fhir">
  <id value="v2-0472"/> 
  <meta> 
    <profile value="http://hl7.org/fhir/StructureDefinition/shareablevalueset"/> 
  </meta> 
  <text> 
    <status value="additional"/> 
    <div xmlns="http://www.w3.org/1999/xhtml">
      <p> TQ Conjunction ID</p> 

      <table class="grid">
        <tr> 
          <td> 
            <b> Code</b> 
          </td> 
          <td> 
            <b> Description</b> 
          </td> 
          <td> 
            <b> Comment</b> 
          </td> 
          <td> 
            <b> Version</b> 
          </td> 
        </tr> 
        <tr> 
          <td> A
            <a name="A"> </a> 
          </td> 
          <td> Asynchronous</td> 
          <td> Do the next specification in parallel with this one (unless otherwise constrained by the
               following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of
               &quot;A&quot; specifies two parallel instructions, as are sometimes used in medication,
               e.</td> 
          <td> added v2.4</td> 
        </tr> 
        <tr> 
          <td> C
            <a name="C"> </a> 
          </td> 
          <td> Actuation Time</td> 
          <td> It will be followed by a completion time for the service.  This code allows one to distinguish
               between the time and priority at which a service should be actuated (e.g. blood should
               be drawn) and the time and priority at which a service should be complet</td> 
          <td> added v2.4</td> 
        </tr> 
        <tr> 
          <td> S
            <a name="S"> </a> 
          </td> 
          <td> Synchronous</td> 
          <td> Do the next specification after this one (unless otherwise constrained by the following
               fields: TQ1-7-start date/time and TQ1-8-end date/time). An &quot;S&quot; specification
               implies that the second timing sequence follows the first, e.g. when a service request
               is</td> 
          <td> added v2.4</td> 
        </tr> 
      </table> 

    </div> 
  </text> 
  <extension url="http://hl7.org/fhir/StructureDefinition/structuredefinition-ballot-status">
    <valueString value="External"/> 
  </extension> 
  <extension url="http://hl7.org/fhir/StructureDefinition/structuredefinition-fmm">
    <valueInteger value="0"/> 
  </extension> 
  <url value="http://hl7.org/fhir/ValueSet/v2-0472"/> 
  <version value="2.8.2"/> 
  <name value="v2 TQ Conjunction ID"/> 
  <status value="active"/> 
  <experimental value="false"/> 
  <publisher value="HL7, Inc"/> 
  <contact> 
    <telecom> 
      <system value="url"/> 
      <value value="http://hl7.org"/> 
    </telecom> 
  </contact> 
  <description value="FHIR Value set/code system definition for HL7 v2 table 0472 ( TQ Conjunction ID)"/> 
  <immutable value="true"/> 
  <compose> 
    <include> 
      <system value="http://hl7.org/fhir/v2/0472"/> 
    </include> 
  </compose> 
</ValueSet> 

Usage note: every effort has been made to ensure that the examples are correct and useful, but they are not a normative part of the specification.