This page is part of the electronic Long-Term Services and Supports Implementation Guide (v2.0.0-ballot: STU2 Ballot 1) based on FHIR (HL7® FHIR® Standard) R4. The current version which supersedes this version is 1.0.0. For a full list of available versions, see the Directory of published versions
: risk1 - JSON Representation
Raw json | Download
{
"resourceType" : "RiskAssessment",
"id" : "risk1",
"meta" : {
"versionId" : "1",
"lastUpdated" : "2020-09-03T10:16:03.512-04:00",
"source" : "#KZ0jzPjXDrhCiMif",
"profile" : [
🔗 "http://hl7.org/fhir/us/eltss/StructureDefinition/RiskAssessment-eltss"
]
},
"text" : {
"status" : "extensions",
"div" : "<div xmlns=\"http://www.w3.org/1999/xhtml\"><p><b>Generated Narrative: RiskAssessment</b><a name=\"risk1\"> </a></p><div style=\"display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%\"><p style=\"margin-bottom: 0px\">Resource RiskAssessment "risk1" Version "1" Updated "2020-09-03 10:16:03-0400" </p><p style=\"margin-bottom: 0px\">Information Source: #KZ0jzPjXDrhCiMif!</p><p style=\"margin-bottom: 0px\">Profile: <a href=\"StructureDefinition-RiskAssessment-eltss.html\">RiskAssessment_eltss</a></p></div><p><b>RiskPlan</b>: <span>: This points to a management plan for any risks. This is not the backup plan, which is an alternative plan for the CarePlan. The risk management plan is meant to help avoid needing the backup plan.</span></p><p><b>status</b>: final</p><p><b>subject</b>: <a href=\"Patient-patientBSJ1.html\">Patient/patientBSJ1</a> " SMITH-JOHNSON"</p><blockquote><p><b>prediction</b></p><p><b>outcome</b>: At risk for falls (finding) <span style=\"background: LightGoldenRodYellow; margin: 4px; border: 1px solid khaki\"> (<a href=\"https://browser.ihtsdotools.org/\">SNOMED CT</a>#129839007)</span></p></blockquote><blockquote><p><b>prediction</b></p><p><b>outcome</b>: At risk of stroke <span style=\"background: LightGoldenRodYellow; margin: 4px; border: 1px solid khaki\"> (<a href=\"https://browser.ihtsdotools.org/\">SNOMED CT</a>#866240007)</span></p></blockquote><p><b>mitigation</b>: Betsy is at risk for falls and of having a stroke. Her risk is increased due to her depression medication. She has grab bars installed in the shower and is working on her balance with a trainer.</p></div>"
},
"extension" : [
{
"url" : "http://hl7.org/fhir/us/eltss/StructureDefinition/eltss-RiskPlan",
"valueReference" : {
"display" : "This points to a management plan for any risks. This is not the backup plan, which is an alternative plan for the CarePlan. The risk management plan is meant to help avoid needing the backup plan."
}
}
],
"status" : "final",
"subject" : {
🔗 "reference" : "Patient/patientBSJ1"
},
"prediction" : [
{
"outcome" : {
"coding" : [
{
"system" : "http://snomed.info/sct",
"code" : "129839007"
}
],
"text" : "At risk for falls (finding)"
}
},
{
"outcome" : {
"coding" : [
{
"system" : "http://snomed.info/sct",
"code" : "866240007"
}
],
"text" : "At risk of stroke"
}
}
],
"mitigation" : "Betsy is at risk for falls and of having a stroke. Her risk is increased due to her depression medication. She has grab bars installed in the shower and is working on her balance with a trainer."
}