This page is part of the Quality Measure STU2 for FHIR R4 Implementation Guide (v3.0.0: STU3) based on FHIR R4. This is the current published version in its permanent home (it will always be available at this URL). For a full list of available versions, see the Directory of published versions
Active as of 2022-02-22 |
Id: | measure-vte-1-FHIR | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Url: | http://hl7.org/fhir/us/cqfmeasures/Measure/measure-vte-1-FHIR | ||||||||||
Version: | 8.2.000 | ||||||||||
Identifier: |
value: 108 |
||||||||||
Name: | VTE_1_FHIR | ||||||||||
Title: | Venous Thromboembolism Prophylaxis | ||||||||||
Status: | active | ||||||||||
Experimental: | true | ||||||||||
Scoring: |
system: http://terminology.hl7.org/CodeSystem/measure-scoring code: proportion display: Proportion |
||||||||||
Improvement Notation: |
system: http://terminology.hl7.org/CodeSystem/measure-improvement-notation code: increase display: Increased score indicates improvement |
||||||||||
Type: |
system: http://terminology.hl7.org/CodeSystem/measure-type code: process |
||||||||||
Date: | 2022-02-22 | ||||||||||
Publisher: | Clinical Quality Information WG | ||||||||||
Description: | This measure assesses the number of patients who received VTE prophylaxis or have documentation why no VTE prophylaxis was given the day of or the day after hospital admission or surgery end date for surgeries that start the day of or the day after hospital admission | ||||||||||
Supplemental Data: |
|
||||||||||
Use Context: |
|
||||||||||
Jurisdiction: | US | ||||||||||
Topic: | 57024-2 | ||||||||||
Copyright: | Measure specifications are in the Public Domain. LOINC(R) is a registered trademark of the Regenstrief Institute. This material contains SNOMED Clinical Terms(R) (SNOMED CT(C)) copyright 2004-2017 International Health Terminology Standards Development Organization. All rights reserved. | ||||||||||
Disclaimer: | These performance measures are not clinical guidelines and do not establish a standard of medical care, and have not been tested for all potential applications. The measures and specifications are provided without warranty | ||||||||||
Approval Date: | 2019-03-08 | ||||||||||
Last Review Date: | 2019-03-08 | ||||||||||
Effective Period: | 2018-01-01..2018-12-31 |