Release 5 Preview #2

This page is part of the FHIR Specification (v4.4.0: R5 Preview #2). The current version which supercedes this version is 5.0.0. For a full list of available versions, see the Directory of published versions . Page versions: R4 R3 R2

4.3.15.472 HL7 Version 2 Table 0472

Vocabulary Work Group Maturity Level: N/AExternal Use Context: Any

This is a table defined as part of HL7 v2 .

Summary

Code System URL:http://terminology.hl7.org/CodeSystem/v2-0472
Value Set URL:http://terminology.hl7.org/ValueSet/v2-0472
Version:2.9
Name:v2.0472
Title:v2 TQ Conjunction ID
Definition:

FHIR Value set/code system definition for HL7 v2 table 0472 ( TQ Conjunction ID)

OID:??
CodeSystem ResourceXML / JSON
ValueSet ResourceXML / JSON

Note: V2 code systems may or may not be case sensitive. V2 Code systems will have the CodeSystem.caseSensitive correctly populated in a future version of this specification.

This value set is not currently used

This code system http://terminology.hl7.org/CodeSystem/v2-0472 defines the following codes:

CodeDisplayDefinitionCommentsVersion
A en: Asynchronous
nl: Asynchroon
en: Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.
nl: Doe de volgende specificatie parallel aan deze (tenzij anders aangegeven ion de volgende velden: TQ1-7-start date/time en TQ1-8-end date/time). Een specificatie "A" specificeert twee parallelle instructies, zoals soms bij medicatiedosering gebruikt, bijv. prednison 1 tablet op maandag, woesndag, vrijdag en een half tablet op dinsdag, donderdag, zaterdag en zondag.
added v2.4
C en: Actuation Time
nl: Actuatietijd
en: It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).
nl: Deze wordt gevolgd door een voltooiingstijd voor de service. Met deze code kan het verschil worden gemaakt tussen tijd en prioriteit waarop de service moet worden geactueerd (bijv. bloed moet worden afgenomen) en de tijd en prioriteit waarop de service moet zijn voltooid (bijv. wanneer resultaten moeten worden gemeld).
added v2.4
S en: Synchronous
nl: Synchroon
en: Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.
nl: Doe de volgende specificatie na deze (tenzij anders aangegeven ion de volgende velden: TQ1-7-start date/time en TQ1-8-end date/time). Een specificatie "S" impliceert dat de tweede tijdsequentie de eerste opvolgt, bijv. als een serviceverzoek wordt gedaan om bloeddruk te meten Q15 minuten na het eerste uur en dan de volgende dag elke twee uur.
added v2.4

Additional Language Displays

CodeNederlands (Dutch, nl)
AAsynchroon
CActuatietijd
SSynchroon

This code system http://terminology.hl7.org/CodeSystem/v2-0472 defines the following codes:

CodeDisplayDefinitionCommentsVersion
A AsynchronousDo the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.added v2.4
C Actuation TimeIt will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).added v2.4
S SynchronousDo the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.added v2.4

Additional Language Displays

CodeNederlands (Dutch, nl)
AAsynchroon
CActuatietijd
SSynchroon

Dit code systeem http://terminology.hl7.org/CodeSystem/v2-0472 definieert de volgende codes:

CodeDisplayDefinitionCommentaarVersie
A AsynchroonDoe de volgende specificatie parallel aan deze (tenzij anders aangegeven ion de volgende velden: TQ1-7-start date/time en TQ1-8-end date/time). Een specificatie "A" specificeert twee parallelle instructies, zoals soms bij medicatiedosering gebruikt, bijv. prednison 1 tablet op maandag, woesndag, vrijdag en een half tablet op dinsdag, donderdag, zaterdag en zondag.added v2.4
C ActuatietijdDeze wordt gevolgd door een voltooiingstijd voor de service. Met deze code kan het verschil worden gemaakt tussen tijd en prioriteit waarop de service moet worden geactueerd (bijv. bloed moet worden afgenomen) en de tijd en prioriteit waarop de service moet zijn voltooid (bijv. wanneer resultaten moeten worden gemeld).added v2.4
S SynchroonDoe de volgende specificatie na deze (tenzij anders aangegeven ion de volgende velden: TQ1-7-start date/time en TQ1-8-end date/time). Een specificatie "S" impliceert dat de tweede tijdsequentie de eerste opvolgt, bijv. als een serviceverzoek wordt gedaan om bloeddruk te meten Q15 minuten na het eerste uur en dan de volgende dag elke twee uur.added v2.4

Additional Language Displays

CodeNederlands (Dutch, nl)
AAsynchroon
CActuatietijd
SSynchroon