This page is part of the FHIR Specification (v3.5.0: R4 Ballot #2). The current version which supercedes this version is 5.0.0. For a full list of available versions, see the Directory of published versions . Page versions: R4 R3
Vocabulary Work Group | Maturity Level: N/A | External | Use Context: Any |
This value set (http://terminology.hl7.org/ValueSet/v3-CalendarType) is defined as part of HL7 v3.
Summary
Defining URL: | http://terminology.hl7.org/ValueSet/v3-CalendarType |
Version: | 2018-08-12 |
Name: | v3.CalendarType |
Title: | v3 Code System CalendarType |
Definition: | **** MISSING DEFINITIONS **** |
OID: | 2.16.840.1.113883.1.11.10682 (for OID based terminology systems) |
Source Resource | XML / JSON |
This value set is used in the following places:
This value set includes codes from the following code systems:
http://terminology.hl7.org/CodeSystem/v3-CalendarType
This expansion generated 19 Aug 2018
This value set contains 1 concepts
Expansion based on http://terminology.hl7.org/CodeSystem/v3-CalendarType version 2018-08-12
All codes from system http://terminology.hl7.org/CodeSystem/v3-CalendarType
Code | Display | Definition |
GREG | Gregorian | The Gregorian calendar is in effect in the most countries of Christian influence since approximately 1582. This calendar superceded the Julian calendar. |