This page is part of the FHIR Specification (v1.0.0: DSTU 2 Ballot 3). The current version which supercedes this version is 5.0.0. For a full list of available versions, see the Directory of published versions . Page versions: R4 R3 R2
**** MISSING DEFINITIONS ****
{ "resourceType": "ValueSet", "id": "v3-CalendarType", "meta": { "lastUpdated": "2015-07-31T00:00:00.000+10:00", "profile": [ "http://hl7.org/fhir/StructureDefinition/valueset-shareable-definition" ] }, "text": { "status": "generated", "div": "<div>!-- Snipped for Brevity --></div>" }, "extension": [ { "url": "http://hl7.org/fhir/StructureDefinition/valueset-oid", "valueUri": "urn:oid:2.16.840.1.113883.1.11.10682" } ], "url": "http://hl7.org/fhir/ValueSet/v3-CalendarType", "version": "2015-07-31", "name": "v3 Code System CalendarType", "status": "active", "experimental": false, "publisher": "HL7, Inc", "contact": [ { "telecom": [ { "system": "other", "value": "http://hl7.org" } ] } ], "date": "2015-07-31", "description": "**** MISSING DEFINITIONS ****", "codeSystem": { "extension": [ { "url": "http://hl7.org/fhir/StructureDefinition/valueset-oid", "valueUri": "urn:oid:2.16.840.1.113883.5.1017" } ], "system": "http://hl7.org/fhir/v3/CalendarType", "caseSensitive": true, "concept": [ { "code": "GREG", "abstract": false, "display": "Gregorian", "definition": "The Gregorian calendar is in effect in the most countries of Christian influence since approximately 1582. This calendar superceded the Julian calendar." } ] } }
Usage note: every effort has been made to ensure that the examples are correct and useful, but they are not a normative part of the specification.